Quick answers
What is Road From Village Moharai To Baigatola?
Road From Village Moharai To Baigatola is a lapsed road project in R.F., Baihar, Balaghat, Madhya Pradesh. The site covers 13.3 acres.
Who is building it?
The applicant is Anil Kumar Garhwal.
Has it been approved?
No. The application was lapsed on 29 Oct 2026, so it is no longer under consideration.
Where is it?
In R.F., Baihar, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.6 crore; a site of 13.3 acres and 5.5 acres (2.2 ha) of forest land.
When was it filed?
The application was filed on 7 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Road From Village Moharai To Baigatola
Project details
| Official title | Construction of road From Village Moharai To Baigatola Under PMJANMAN Scheme |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2026 |
| Application filed | 7 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Anil Kumar Garhwal |
| Land area | 13.3 acres (5.4 ha) |
| Forest land | 5.5 acres (2.2 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | R.F. |
| Taluk / tehsil | Baihar |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10160 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Aug 2026 (this page) | Lapsed | 13.3 acres | ₹2.6 crore |
| New project filed 17 Jun 2025 | Application filed | 13.3 acres | ₹2.6 crore |
In context
52 applications in Balaghat since January 2022 are in the same category (Roads & highways): 5 approved, 19 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2.2 years from filing to approval. At 13.3 acres, this one is larger than 78% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
R.F., Baihar, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road From Village Moharai To Baigatola — application filed, 0 m away
- Mahrai To Baigatola Road — initial checks, 1.1 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — more information requested, 2.2 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — forest land use approved, 2.2 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — lapsed, 2.2 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — lapsed, 2.2 km away
- Murenda (FV) Approach Road in PMJANMAN Schmee, Baiga Basahat Conectiviti — more information requested, 6.3 km away
- Supkhar Mobile Tower — under wildlife review, 6.6 km away
More from Anil Kumar Garhwal in Balaghat
- Constriction of Road From Amatola To Ghursibehra in PMJANMAN SCHEAM — initial checks
- Fahehpur To Kukada Road — initial checks
- Khami to Tikariya — initial checks
- Mohgaon to Sawarjhodi Road — initial checks
- Maliya to Bindrapani — initial checks
- Mahrai To Baigatola Road — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.