Quick answers
What is Road From Village Moharai To Baigatola?
Road From Village Moharai To Baigatola is a proposed building project in R.F., Baihar, Balaghat, Madhya Pradesh. The site covers 13.3 acres.
Who is building it?
The applicant is Anil Kumar Garhwal.
Has it been approved?
Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.
Where is it?
In R.F., Baihar, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.6 crore and a site of 13.3 acres.
When was it filed?
The application was filed on 17 Jun 2025.
Project details
| Official title | Construction of road From Village Moharai To Baigatola Under PMJANMAN Scheme |
|---|---|
| Status | Application filed |
| Status since | 17 Jun 2025 |
| Application filed | 17 Jun 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Anil Kumar Garhwal |
| Land area | 13.3 acres (5.4 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | R.F. |
| Taluk / tehsil | Baihar |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12047 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Aug 2026 | Lapsed | 13.3 acres | ₹2.6 crore |
| New project filed 17 Jun 2025 (this page) | Application filed | 13.3 acres | ₹2.6 crore |
In context
14 applications in Balaghat since January 2022 are in the same category (Buildings & townships): 2 approved, 11 filed or under review, and 1 withdrawn, lapsed or rejected. At 13.3 acres, this one is larger than 67% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
R.F., Baihar, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road From Village Moharai To Baigatola — lapsed, 0 m away
- Mahrai To Baigatola Road — initial checks, 1.1 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — more information requested, 2.2 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — forest land use approved, 2.2 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — lapsed, 2.2 km away
- Bsnl 4g Saturation Project in Balaghat Buffer Zone — lapsed, 2.2 km away
- Murenda (FV) Approach Road in PMJANMAN Schmee, Baiga Basahat Conectiviti — more information requested, 6.3 km away
- Supkhar Mobile Tower — under wildlife review, 6.6 km away
More from Anil Kumar Garhwal in Balaghat
- Constriction of Road From Amatola To Ghursibehra in PMJANMAN SCHEAM — initial checks
- Fahehpur To Kukada Road — initial checks
- Khami to Tikariya — initial checks
- Mohgaon to Sawarjhodi Road — initial checks
- Maliya to Bindrapani — initial checks
- Mahrai To Baigatola Road — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.