Quick answers
What is Gond Devsar Multi Village Scheme?
Gond Devsar Multi Village Scheme is a lapsed water and irrigation project in Koharakhoh, Deosar, Singrauli, Madhya Pradesh. The site covers 98.2 acres.
Who is building it?
The applicant is Madhya Pradesh Jal Nigam Maryadit.
Has it been approved?
No. The application was lapsed on 2 May 2024, so it is no longer under consideration.
Where is it?
In Koharakhoh, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹360.3 crore; a site of 98.2 acres and 9.8 acres (4 ha) of forest land.
When was it filed?
The application was filed on 1 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 May 2024 |
| Application filed | 1 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Madhya Pradesh Jal Nigam Maryadit |
| Land area | 98.2 acres (39.7 ha) |
| Forest land | 9.8 acres (4 ha) |
| Project cost | ₹360.3 crore |
| Village / locality | Koharakhoh |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10189 |
In context
11 applications in Singrauli since January 2022 are in the same category (Water & irrigation): 5 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 98.2 acres, this one is smaller than 90% of them.
Where it is
Koharakhoh, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gond Devsar Multi Village Scheme — lapsed, 0 m away
- Hatta- Dudhmania Coal Block, Main Basin Coalfield — forest land use approved, 5.3 km away
- Hatta-Dudhmania Coal Block — lapsed, 5.3 km away
- Hatta Coal Block — lapsed, 6.4 km away
- Sarai East (South) Coal Mine — forest land use approved, 6.8 km away
- Jhara Stone Quarry — cleared for impact study, 7.4 km away
- Jhara Stone Quarry — cleared for impact study, 8 km away
- Jhara Stone Quarry — lapsed, 8 km away
More from Madhya Pradesh Jal Nigam Maryadit in Singrauli
- Monopole Installation work Waidhan 2 MVS — decision issued
- Mono Pole Installation Work — more information requested
- Mono pole Installation work — more information requested
- Waidhan-2 Multi Village Rural Water Supply Scheme — forest land use approved
- Waidhan-2 Multi Village Rural Water Supply Scheme — forest land use approved
- Waidhan-1 Multi Village Rural Water Supply Scheme (HT LINE) — forest land use approved
11 Madhya Pradesh Jal Nigam Maryadit projects in Singrauli
All 51 Madhya Pradesh Jal Nigam Maryadit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.