Quick answers
What is Waidhan-1 Multi Village Rural Water Supply Scheme (HT LINE)?
Waidhan-1 Multi Village Rural Water Supply Scheme (HT LINE) is an approved power project in Suidih, Singrauli, Madhya Pradesh. The site covers 43.5 acres.
Who is building it?
The applicant is Madhya Pradesh Jal Nigam Maryadit.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 8 Jul 2025), as of 27 Nov 2026.
Where is it?
In Suidih, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 43.5 acres and 11 acres (4.5 ha) of forest land.
When was it filed?
The application was filed on 7 Jan 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 8 Jul 2025 |
| Application filed | 7 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Madhya Pradesh Jal Nigam Maryadit |
| Land area | 43.5 acres (17.6 ha) |
| Forest land | 11 acres (4.5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Suidih |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11425 |
In context
16 applications in Singrauli since January 2022 are in the same category (Power): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 43.5 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Suidih, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharti Airtel ltd. 5G OFC Waidhan-Vishalpur-Wadrafnagar-Sasan route DFO… — forest land use approved, 1.8 km away
- Piprakurund-1 Sand Deposit — environmental approval granted, 5.2 km away
- Piprakurund-1 Sand Deposit — cleared for impact study, 5.2 km away
- Piprakurund-2 Sand Deposit — under environmental review, 5.2 km away
- Kandopani Sand Deposit — environmental approval granted, 5.4 km away
- Kandopani Sand Deposit — cleared for impact study, 5.4 km away
- Harrahwaha-3 Sand Deposit — under environmental review, 5.7 km away
- Harrahwaha-3 Sand Deposit — cleared for impact study, 5.7 km away
More from Madhya Pradesh Jal Nigam Maryadit in Singrauli
- Monopole Installation work Waidhan 2 MVS — decision issued
- Mono Pole Installation Work — more information requested
- Mono pole Installation work — more information requested
- Waidhan-2 Multi Village Rural Water Supply Scheme — forest land use approved
- Gond Devsar Multi Village Scheme — lapsed
- Waidhan-2 Multi Village Rural Water Supply Scheme — forest land use approved
11 Madhya Pradesh Jal Nigam Maryadit projects in Singrauli
All 51 Madhya Pradesh Jal Nigam Maryadit projects across India