What is Developing? Open the mapMap

LapsedRoads & highways · Betul, Madhya Pradesh

Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Chilkapur-Gargud Raiyat route DFO South Betul

Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Chilkapur-Gargud Raiyat route DFO South Betul is a lapsed road project in Ambara, Athner, Betul, Madhya Pradesh. The site covers 0.7 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 3 Jan 2024).

See it on the live map All projects in Betul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Chilkapur-Gargud Raiyat route DFO South Betul is a lapsed road project in Ambara, Athner, Betul, Madhya Pradesh. The site covers 0.7 acres.

Who is building it?

The applicant is Jio Digital Fibre Private LTD.

Has it been approved?

No. The application was lapsed on 3 Jan 2024, so it is no longer under consideration.

Where is it?

In Ambara, Athner, Betul, Madhya Pradesh.

How big is it?

It has a stated cost of ₹20 lakh; a site of 0.7 acres and 2,500 m² of forest land.

When was it filed?

The application was filed on 25 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road…

Project details

StatusLapsed
Status since3 Jan 2024
Application filed25 Aug 2023
Approval soughtForest land use
Application typeChange of use
SectorRoads & highways
ApplicantJio Digital Fibre Private LTD
Land area3,000 m²
Forest land2,500 m²
Project cost₹20 lakh
Village / localityAmbara
Taluk / tehsilAthner
DistrictBetul
StateMadhya Pradesh
Location fromSite area on record
Our referenceWID-MP-10345

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 3 Jan 2024Forest land use approved2.7 acres₹20 lakh
Change of use filed 25 Aug 2023 (this page)Lapsed0.7 acres₹20 lakh

In context

15 applications in Betul since January 2022 are in the same category (Roads & highways): 1 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.7 acres, this one is smaller than 77% of them.

Where it is

Ambara, Athner, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jio Digital Fibre Private LTD in Betul

4 Jio Digital Fibre projects in Betul
All 787 Jio Digital Fibre projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.