Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority route LM Sarni MPPTCL DFO North Betul is an approved telecom project in Asir R F, Ghoda Dongri, Betul, Madhya Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Sept 2025), as of 27 Nov 2026.
Where is it?
In Asir R F, Ghoda Dongri, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3 lakh; a site of 0.1 acres and 360 m² of forest land.
When was it filed?
The application was filed on 27 Aug 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Sept 2025 |
| Application filed | 27 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 400 m² |
| Forest land | 360 m² |
| Project cost | ₹3 lakh |
| Village / locality | Asir R F |
| Taluk / tehsil | Ghoda Dongri |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11415 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.1 acres, this one is smaller than 70% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asir R F, Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cement Grinding Unit of 4.0 MTPA of M/s Orient Cement Limited Taluka:… — cleared for impact study, 550 m away
- P2P Networks Private Limited - Laying of OFC cable between Sarni 220 KV Sub… — forest land use approved, 850 m away
- Development of Samudayik Kendra at Mokshdham — lapsed, 1.1 km away
- 1x660 MW Satpura Super-critical Thermal Power Project (Expansion, Phase-V,… — environmental approval granted, 1.3 km away
- 2x250 MW Thermal Power Plant at Satpura Thermal Power Station (STPS), Sarni –… — environmental approval granted, 1.3 km away
- Diversion of 373 Hectare (Old Ash pond) Ash pond land for installation of 200… — more information requested, 1.3 km away
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — under environmental review, 1.6 km away
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — environmental approval granted, 1.6 km away
More from Jio Digital Fibre Private LTD in Betul
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
4 Jio Digital Fibre projects in Betul
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.