Project details
| Status | More information requested |
|---|---|
| Status since | 14 May 2026 |
| Application filed | 21 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Sandeep Dhurve |
| Land area | 347.1 acres (140.5 ha) |
| Forest land | 17.3 acres (7 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Mehrabori |
| Taluk / tehsil | Barghat |
| District | Seoni |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10417 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Dec 2025 (this page) | More information requested | 347.1 acres | ₹3.3 crore |
| Change of use filed 12 Aug 2024 | Lapsed | 385.4 acres | ₹3.3 crore |
In context
15 applications in Seoni since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 347.1 acres, this one is smaller than 53% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mehrabori, Barghat, Seoni, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bifurcation of 33kV ARI feeder — lapsed, 200 m away
- Regional Common Sanitary Landfill Facility for Seoni and it's cluster ULBs at… — cleared for impact study, 2 km away
- Industrial project by M/s EIIL Energy and Manganese Private Limited — under environmental review, 3.9 km away
- Manufacturing of Either or Combination of Ferro Manganese (49,170 TPA) OR… — cleared for impact study, 3.9 km away
- Greenfield Ferro Alloy plant with 2 x 6 MVA SAF to produce 22,500 TPA of Si-Mn… — cleared for impact study, 4.9 km away
- Radhadehi Stone Quarry — environmental approval granted, 8.4 km away
- Radhadehi Stone Quarry — cleared for impact study, 8.4 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 11 km away
More from Sandeep Dhurve in Seoni
- Project for Laying of 33KV Line Village Mohgao to Khawasa Under Seoni — more information requested
- 33KV Feeder From Riddi to Pindrai — in-principle approval, conditions pending
- Project for Erection of 33/11KV Substation — lapsed
- Project for Laying of 33KV Line Village Mohgao to Khawasa Under Seoni — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.