Work of New 33 KV Line Interconnection From 220/33 KV Ss Bijauri to 33/11 KV Ss Devri is a lapsed power project in Bijauri, Manpur, Umaria, Madhya Pradesh. The site covers 7.1 acres.
Who is building it?
The applicant is Mppkvvcl Jabalpur.
Has it been approved?
No. The application was lapsed on 4 May 2024, so it is no longer under consideration.
Where is it?
In Bijauri, Manpur, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3.2 crore; a site of 7.1 acres and 7.1 acres (2.9 ha) of forest land.
When was it filed?
The application was filed on 4 May 2024.
Project details
| Official title | Work of New 33 KV Line Interconnection From 220/33 KV Ss Bijauri to 33/11 KV Ss Devri Under Rds Scheme |
|---|---|
| Status | Lapsed |
| Status since | 4 May 2024 |
| Application filed | 4 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mppkvvcl Jabalpur |
| Land area | 7.1 acres (2.9 ha) |
| Forest land | 7.1 acres (2.9 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Bijauri |
| Taluk / tehsil | Manpur |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10439 |
In context
17 applications in Umaria since January 2022 are in the same category (Power): 0 approved, 7 filed or under review, and 10 withdrawn, lapsed or rejected. At 7.1 acres, this one is smaller than 88% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijauri, Manpur, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Raksha Stone mine for making Gitti — environmental approval granted, 2.8 km away
- 33 KV Bijauri to Tala — lapsed, 3.2 km away
- Work of New 33 KV Line Interconnection From 220/33 KV Ss Bijauri to 33/11 KV… — lapsed, 3.3 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 3.3 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — decision issued, 3.3 km away
- 33 KV Feeder From 220/33 KV Bijauri to Devri Line — under wildlife review, 4.5 km away
- 33 KV Feeder From 220/33 KV Bijauri to Devri Line — application filed, 4.5 km away
- 33 KV Feeder From 220/33 KV Bijauri to Devri Line — under forest review, 4.5 km away
More from Mppkvvcl Jabalpur in Umaria
- 33 KV Bijauri to Tala — lapsed
- Work of New 33 KV Line Interconnection From 220/33 KV Ss Bijauri to 33/11 KV… — lapsed
- 33 KV Feeder From 220/33 KV Bijauri to Dev -1 — lapsed
- 33 KV Interconnection From 132/33 KV Ss Umariya to 33/11 KV Ss Kudra — lapsed
About this information