Quick answers
What is Bsnl 4g Saturation Project?
Bsnl 4g Saturation Project is a lapsed telecom project in Panbehra, Athner, Betul, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
No. The application was lapsed on 20 May 2024, so it is no longer under consideration.
Where is it?
In Panbehra, Athner, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 lakh; a site of 0 acres and 680 m² of forest land.
When was it filed?
The application was filed on 12 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 May 2024 |
| Application filed | 12 Jan 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Land area | 100 m² |
| Forest land | 680 m² |
| Project cost | ₹12 lakh |
| Village / locality | Panbehra |
| Taluk / tehsil | Athner |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10659 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Panbehra, Athner, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project 5oo Days — lapsed, 1.3 km away
- Bsnl 4g Saturation Project — lapsed, 2.1 km away
- 11 KV Sukwa Mix feeder, FSP works under RDSS KfW (FSP) package — more information requested, 2.8 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable along the… — forest land use approved, 3.1 km away
- Bsnl 4g Saturation Project — lapsed, 5.4 km away
- Bsnl 4g Saturation Project — lapsed, 6.2 km away
- Barkhed Stone Quarry — lapsed, 9.7 km away
- Barkhed Stone Quarry — lapsed, 9.7 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- Bsnl 4g Saturation Project — lapsed
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.