Quick answers
What is this project?
4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor, Goulagondi, Kund, Lakhasiri is an approved telecom project in Laladhana, Amla, Betul, Madhya Pradesh. The site covers 1.8 acres.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Dec 2024), as of 27 Nov 2026.
Where is it?
In Laladhana, Amla, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 lakh; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 1 Oct 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Dec 2024 |
| Application filed | 1 Oct 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Laladhana |
| Taluk / tehsil | Amla |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10853 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 87% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Laladhana, Amla, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission For Construction of Meda Multi Village Water Supply Pipeline Schem — more information requested, 4.2 km away
- Permission For Construction of Mendha Multi Village Water Supply Pipeline Schem — lapsed, 4.8 km away
- Nayak Charsi Stone Quarry — environmental approval granted, 8.3 km away
- Nirgud Lift Irrigation Project — under forest review, 8.3 km away
- Nayakcharsi Stone Quarry — environmental approval granted, 8.4 km away
- Nayakcharsi Stone Quarry — environmental approval granted, 8.6 km away
- Kolgaon Stone Quarry — environmental approval granted, 9.1 km away
- Kolgaon Stone Quarry — initial checks, 9.1 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- Bsnl 4g Saturation Project — lapsed
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
- 4g Saturation Project 5oo Days Project- at Ladi, Theska, Nadha, Banoor,… — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.