What is Construction of Road Richfalfate to Indaawadi?
Construction of Road Richfalfate to Indaawadi is a proposed road project in Indhawari, Punasa, East Nimar, Madhya Pradesh. The site covers 15.6 acres.
Who is building it?
The applicant is Executive Engineer Pwd Division Khandwa.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Indhawari, Punasa, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹9.1 crore; a site of 15.6 acres and 9.5 acres (3.9 ha) of forest land.
When was it filed?
The application was filed on 20 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Oct 2026 |
| Application filed | 20 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Pwd Division Khandwa |
| Land area | 15.6 acres (6.3 ha) |
| Forest land | 9.5 acres (3.9 ha) |
| Project cost | ₹9.1 crore |
| Village / locality | Indhawari |
| Taluk / tehsil | Punasa |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10660 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Sept 2026 (this page) | More information requested | 15.6 acres | ₹9.1 crore |
| New project filed 23 Feb 2026 | Lapsed | 15.6 acres | ₹9.1 crore |
In context
33 applications in East Nimar since January 2022 are in the same category (Roads & highways): 6 approved, 14 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 15.6 acres, this one is larger than 72% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Indhawari, Punasa, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Road Richfalfate to Indaawadi — lapsed, 0 m away
- Construction of Road Richfalfate to Indaawadi — lapsed, 350 m away
- Saktapur Unit, Substation and Road — forest land use approved, 4.1 km away
- Gram Panchayat Bhawan — lapsed, 7.8 km away
- 90 MW Omkareshwar Floating Solar Power Project — more information requested, 7.9 km away
- Harvanspura Stone Quarry — more information requested, 9.4 km away
- Londi B Stone Quarry — more information requested, 9.4 km away
- स्वच्छ भारत मिशन (शहरी) 2.0 अंतर्गत सार्वजनिक शौचालय एवं मूत्रालय निर्माण by… — lapsed, 11.7 km away
More from Executive Engineer Pwd Division Khandwa in East Nimar
- Omkareshwar to Kothi Via Duhikiya Dhawdiya Right Side Bypass Road — more information requested
- 03 Nos-Helipad, Green House, Toilet Block approach road at Omkareshwar for… — lapsed
- Omkareshwar Kothi to Left Side Bypass road length 3.70km — lapsed
- Karwani, Chindradev to Gulai Vangram approach road — lapsed
- Construction of Jhirpa to Dawania Road — more information requested
- Construction of Salai to Kirgaon Road — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.