Quick answers
What is this project?
03 Nos-Helipad, Green House, Toilet Block approach road at Omkareshwar for Sinhasth 2028 is a lapsed airport project in Protected, Punasa, East Nimar, Madhya Pradesh. The site covers 6.9 acres.
Who is building it?
The applicant is Executive Engineer Pwd Division Khandwa.
Has it been approved?
No. The application was lapsed on 23 Nov 2026, so it is no longer under consideration.
Where is it?
In Protected, Punasa, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹9.2 crore; a site of 6.9 acres and 6.9 acres (2.8 ha) of forest land.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Airports |
| Applicant | Executive Engineer Pwd Division Khandwa |
| Land area | 6.9 acres (2.8 ha) |
| Forest land | 6.9 acres (2.8 ha) |
| Project cost | ₹9.2 crore |
| Village / locality | Protected |
| Taluk / tehsil | Punasa |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11013 |
In context
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Protected, Punasa, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Samudayik Kendra Nagar Parishad Omkareshwar — withdrawn, 400 m away
- Multi-Level Parking Near Kuber Bhandari Temple Nagar Parishad Omkareshwar — more information requested, 450 m away
- 33/11 KV Substation Omkareshwar Simhast 2028 — more information requested, 550 m away
- Training center — lapsed, 600 m away
- Construction of Ekatma Dham project office — more information requested, 650 m away
- Underground water pipeline for NTPC Khargone Super Thermal Power Plant (2X660) — forest land use approved, 1.3 km away
- Acharya Shankar Museum – Advait Lok" Revision and Amendment of Site A-1… — environmental approval granted, 1.7 km away
- Approach Road From Nhdc Power Station Office to Sailani Boat Club No. 2 at… — initial checks, 1.7 km away
More from Executive Engineer Pwd Division Khandwa in East Nimar
- Omkareshwar to Kothi Via Duhikiya Dhawdiya Right Side Bypass Road — more information requested
- Omkareshwar Kothi to Left Side Bypass road length 3.70km — lapsed
- Construction of Road Richfalfate to Indaawadi — more information requested
- Construction of Road Richfalfate to Indaawadi — lapsed
- Karwani, Chindradev to Gulai Vangram approach road — lapsed
- Construction of Jhirpa to Dawania Road — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.