Quick answers
What is this project?
Diversion of Forest Land for Upgradation to Two Lane With Paved Shoulders/ Four Lane Configuration of Singrauali Bagdara Chitrangi Road National Highway No. 135-C is a lapsed road project in Baheri Pf, Chitrangi, Singrauli, Madhya Pradesh. The site covers 471 acres.
Who is building it?
The applicant is Morth (Nh-Mp).
Has it been approved?
No. The application was lapsed on 23 Nov 2024, so it is no longer under consideration.
Where is it?
In Baheri Pf, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹671 crore; a site of 471 acres and 85.9 acres (34.7 ha) of forest land.
When was it filed?
The application was filed on 27 Jul 2024.
Project details
| Official title | Proposal for Diversion of Forest Land for Upgradation to Two Lane With Paved Shoulders/ Four Lane Configuration of Singrauali Bagdara Chitrangi Road National Highway No. 135-C. |
|---|---|
| Status | Lapsed |
| Status since | 23 Nov 2024 |
| Application filed | 27 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Morth (Nh-Mp) |
| Land area | 471 acres (190.6 ha) |
| Forest land | 85.9 acres (34.7 ha) |
| Project cost | ₹671 crore |
| Village / locality | Baheri Pf |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-10839 |
In context
27 applications in Singrauli since January 2022 are in the same category (Roads & highways): 6 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 471 acres, this one is larger than 95% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baheri Pf, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project — forest land use approved, 4.4 km away
- Gulhariya Basemetal (Lead and Copper) Block Gulhariya Basemetal (Lead and… — forest land use approved, 5.7 km away
- Piparwan Crusher Stone Quarry — lapsed, 8.1 km away
- Piparwan Stone Quarry — lapsed, 8.3 km away
- Piparvan Metal Stone Quarry — lapsed, 8.3 km away
- Piparwan Stone Quarry — under environmental review, 8.3 km away
- Piparwan Stone Quarry — cleared for impact study, 8.5 km away
- Maa Adi Shakti Stone Crusher — cleared for impact study, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.