Quick answers
What is 4g Saturation Project?
4g Saturation Project is an approved project in Amrapan, Chitrangi, Singrauli, Madhya Pradesh. The site covers 1.8 acres.
Who is building it?
The applicant is Basant Kumre.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2025), as of 27 Nov 2026.
Where is it?
In Amrapan, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 1.8 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 7 May 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Apr 2025 |
| Application filed | 7 May 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Other |
| Applicant | Basant Kumre |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Amrapan |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11739 |
In context
39 applications in Singrauli since January 2022 are in the same category (Other): 17 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 1.8 acres, this one is smaller than 92% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amrapan, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Piparwan Crusher Stone Quarry — lapsed, 4.3 km away
- Diversion of Forest Land for Upgradation to Two Lane With Paved Shoulders/… — lapsed, 4.4 km away
- Piparwan Stone Quarry — cleared for impact study, 4.5 km away
- Piparwan Stone Quarry — lapsed, 4.6 km away
- Piparwan Stone Quarry — under environmental review, 4.7 km away
- Piparvan Metal Stone Quarry — lapsed, 4.8 km away
- Maa Adi Shakti Stone Crusher — cleared for impact study, 5.1 km away
- Maa Adi Shakti Stone Crusher — lapsed, 5.1 km away
More from Basant Kumre in Singrauli
- ROW for 4G Saturation Project — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.