Quick answers
What is this project?
Bsnl 4g Tower at Banoor in Mission 500 Days for Uncovered Villages is a lapsed telecom project in Banu, Bhainsdehi, Betul, Madhya Pradesh. It seeks 0.1 acres of forest land.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
No. The application was lapsed on 30 Jun 2024, so it is no longer under consideration.
Where is it?
In Banu, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 lakh and 250 m² of forest land.
When was it filed?
The application was filed on 8 Jan 2024.
Project details
| Official title | Bsnl 4g Tower at Banoor in Mission 500 Days for Uncovered Villages in Betul District |
|---|---|
| Status | Lapsed |
| Status since | 30 Jun 2024 |
| Application filed | 8 Jan 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Forest land | 250 m² |
| Project cost | ₹12 lakh |
| Village / locality | Banu |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10974 |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banu, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project — lapsed, 900 m away
- 4g Saturation Project — lapsed, 2.4 km away
- 11 KV Janona Mix feeder, FSP works under RDSS KfW (FSP) package — under forest review, 3.2 km away
- Madhya Pradesh Tourism — not approved, 7.2 km away
- New 11 KV Kukru DLF Feeder, FSP Works under RDSS KfW(FSP) package — under forest review, 8.4 km away
- Bsnl 4g Saturation Project — lapsed, 9.1 km away
- New 11 KV Baramacha DLF Feeder, FSP Works under RDSS KfW(FSP) package — under forest review, 9.4 km away
- Bsnl 4g Saturation Project — lapsed, 9.5 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- Bsnl 4g Saturation Project — lapsed
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.