Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Talwadiya-Selda Mal route DFO Khandwa is a lapsed road project in Dhangaon, Khandwa, East Nimar, Madhya Pradesh. The site covers 3.2 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Dhangaon, Khandwa, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 31 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 31 Mar 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Dhangaon |
| Taluk / tehsil | Khandwa |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11054 |
In context
33 applications in East Nimar since January 2022 are in the same category (Roads & highways): 6 approved, 14 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 3.2 acres, this one is larger than 52% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhangaon, Khandwa, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amrut 2.0 — forest land use approved, 2.6 km away
- Construction of Madni to Harivanshpura Road — in-principle approval, conditions pending, 5.3 km away
- Approach Road for PH: Khalwa MLIS — in-principle approval, conditions pending, 6.7 km away
- HARDA - ASHAPUR Road — lapsed, 7.5 km away
- Khandwa Chanera Forest Permission — lapsed, 7.9 km away
- Diversion of 0.0411 Ha of Forest Land for Construction of Mobile Tower — lapsed, 8.1 km away
- Bharti Airtel Limited Project Harda-Roshni-Khalwa-Tukaithad route, district… — forest land use approved, 8.8 km away
- 132 KV Transmission Line to Pump House 1 & 2 of Khandwa Micro Lift Irrigation… — under forest review, 9.6 km away
More from Jio Digital Fibre Private LTD in East Nimar
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — more information requested
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
6 Jio Digital Fibre projects in East Nimar
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.