Quick answers
What is this project?
132 KV Transmission Line to Pump House 1 & 2 of Khandwa Micro Lift Irrigation Project (Underground Pipeline) is a proposed power project in Andhariya, Khalwa, East Nimar, Madhya Pradesh. The site covers 1,206.5 acres.
Who is building it?
The applicant is Sandeep Sharma.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Andhariya, Khalwa, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹48 crore; a site of 1,206.5 acres and 27.6 acres (11.2 ha) of forest land.
When was it filed?
The application was filed on 1 May 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 1 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Sandeep Sharma |
| Land area | 1,206.5 acres (488.3 ha) |
| Forest land | 27.6 acres (11.2 ha) |
| Project cost | ₹48 crore |
| Village / locality | Andhariya |
| Taluk / tehsil | Khalwa |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09313 |
In context
16 applications in East Nimar since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1,206.5 acres, this one is larger than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Andhariya, Khalwa, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33/11 KV S/s Malgaon — forest land use approved, 2.3 km away
- Khandwa Chanera Forest Permission — lapsed, 3.9 km away
- Construction of Madni to Harivanshpura Road — in-principle approval, conditions pending, 5.1 km away
- Amrut 2.0 — forest land use approved, 7 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 9.6 km away
- Diversion of 0.0411 Ha of Forest Land for Construction of Mobile Tower — lapsed, 10.8 km away
- Khandwa Micro Lift Irrigation Project (Underground Pipeline). — forest land use approved, 11 km away
- SIWANA CRUSHER STONE QUARRY, AREA- 1.00 Ha. — environmental approval granted, 11.8 km away
More from Sandeep Sharma in East Nimar
- Khandwa Micro Lift Irrigation Project — environmental approval granted
- Khandwa Micro Lift Irrigation Project (Underground Pipeline). — forest land use approved