Project details
| Status | Forest land use approved |
|---|---|
| Status since | 28 Nov 2025 |
| Application filed | 5 Jan 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | Rural Development |
| Land area | 17.9 acres (7.2 ha) |
| Forest land | 8.3 acres (3.4 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Kamach |
| Taluk / tehsil | Kusmi |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11080 |
In context
29 applications in Sidhi since January 2022 are in the same category (Water & irrigation): 10 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 17.9 acres, this one is smaller than 64% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamach, Kusmi, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kusmi Water Supply Project — lapsed, 0 m away
- Kusmi Water Supply Project — decision issued, 0 m away
- Sidhi Gulabsagar (11 KV Electrical Line) — forest land use approved, 1.3 km away
- Sidhi Gulabsagar (11 KV Electrical Line) — decision issued, 1.3 km away
- Bastua MBR Water Supply Project — forest land use approved, 5.5 km away
- Bastua MBR Water Supply Project — decision issued, 5.5 km away
- PMJANMAN Road L-088 Bhadoura Khokhara (Badakadol) Road to Gurh Tola Baiga Basti — under wildlife review, 6.8 km away
- BSNL MOBILE-4G SATURATION PROJECT-FHULWA , Pankhora , Runda and Baigawa VILLAGE — more information requested, 8.8 km away
More from Rural Development in Sidhi
- Sidhi Gulabsagar (11 KV Electrical Line) — forest land use approved
- Sidhi Gulabsagar (11 KV Electrical Line) — decision issued
- Gulabsagar MVS Water Supply Project — forest land use approved
- Sidhi Gulabsagar MVS (Son Ghariyal) — decision issued
- Sidhi Bansagar Mvs — forest land use approved
- Kusmi Water Supply Project — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.