Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 13 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Rural Development |
| Land area | 5.1 acres (2.1 ha) |
| Forest land | 3.3 acres (1.3 ha) |
| Project cost | ₹5 crore |
| Village / locality | Khamchaura |
| Taluk / tehsil | Majhauli |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11122 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Aug 2024 (this page) | Forest land use approved | 5.1 acres | ₹5 crore |
| New project filed 29 Jan 2024 | Decision issued | 5.1 acres | ₹5 crore |
In context
29 applications in Sidhi since January 2022 are in the same category (Water & irrigation): 10 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 5.1 acres, this one is smaller than 89% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khamchaura, Majhauli, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhanauli MBR Water Supply Project — decision issued, 0 m away
- Mbr Dhanuali Water Supply Project — lapsed, 250 m away
- Bridge Across Umdari River on Badkadol to Dubri Approach Road — more information requested, 2.2 km away
- Amohradol Tank Scheme Phase 1 — more information requested, 6.1 km away
- Primary Health Centre and Boundary Wall — decision issued, 7.9 km away
- Vadiya MBR water supply — more information requested, 8.9 km away
- Vadiya MBR water supply — more information requested, 8.9 km away
- Karmai Gitty Stone Mine — lapsed, 9 km away
More from Rural Development in Sidhi
- Sidhi Gulabsagar (11 KV Electrical Line) — forest land use approved
- Sidhi Gulabsagar (11 KV Electrical Line) — decision issued
- Kusmi Water Supply Project — forest land use approved
- Gulabsagar MVS Water Supply Project — forest land use approved
- Sidhi Gulabsagar MVS (Son Ghariyal) — decision issued
- Sidhi Bansagar Mvs — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.