Quick answers
What is this project?
Long Belt Conveyer from Dhirauli Coal Mine to Mahan TPP by Mahan Energen Limited is an approved mining project in Mohanban R F, Singrauli, Madhya Pradesh. The site covers 248.1 acres.
Who is building it?
The applicant is Mahan Energen Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Jul 2026), as of 27 Nov 2026.
Where is it?
In Mohanban R F, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹450 crore; a site of 248.1 acres and 57.7 acres (23.4 ha) of forest land.
When was it filed?
The application was filed on 25 Jun 2025.
Project details
| Official title | Construction of Long Belt Conveyer from Dhirauli Coal Mine to Mahan TPP in Singrauli District of Madhya Pradesh by Mahan Energen Limited. |
|---|---|
| Status | Forest land use approved |
| Status since | 16 Jul 2026 |
| Application filed | 25 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahan Energen Limited |
| Land area | 248.1 acres (100.4 ha) |
| Forest land | 57.7 acres (23.4 ha) |
| Project cost | ₹450 crore |
| Village / locality | Mohanban R F |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11133 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 248.1 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Mohanban R F, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bandhaura to Dhirauli (Connecting Rajmilan MDR 16 no. to Dongari) — lapsed, 1.1 km away
- Bandhaura to Dhirauli (Connecting Rajmilan MDR 16 no. to Dongari) — forest land use approved, 2 km away
- Bandhaura to Dhirauli (Connecting Rajmilan MDR 16 no. to Dongari) — lapsed, 2 km away
- Construction of Conveyor Belt for Coal Transportation — forest land use approved, 2.6 km away
- 33 KV HT Line from 132 KV S/s Nagwa to Mahan Coal Block of M/s JK Cement Limited — forest land use approved, 2.8 km away
- Mahan Underground Coal mine — environmental approval granted, 3.6 km away
- Mahan Underground Coal mine — cleared for impact study, 3.6 km away
- Mahan Underground Coal mine — forest land use approved, 3.6 km away
More from Mahan Energen Limited in Singrauli
- Mara II Mahan Coal Mine — under forest review
- Mara II Mahan Coal Mine — lapsed
- Mara II Mahan Coal Mine — forest land use approved
- Gondbahera Ujheni East Coal Mine — environmental approval granted
- Railway Siding from Gajara Bahara Station to Dhirauli Coal Mine by Mahan… — forest land use approved
- Mara II Mahan Coal Mine — lapsed
All 13 Mahan Energen projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.