Quick answers
What is this project?
Railway Siding from Gajara Bahara Station to Dhirauli Coal Mine by Mahan Energen Limited is an approved railway project in Mohanban R F, Singrauli, Madhya Pradesh. The site covers 1,166.6 acres.
Who is building it?
The applicant is Mahan Energen Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Jun 2026), as of 27 Nov 2026.
Where is it?
In Mohanban R F, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹850 crore; a site of 1,166.6 acres and 38.1 acres (15.4 ha) of forest land.
When was it filed?
The application was filed on 9 Jul 2025.
Project details
| Official title | Construction of Railway Siding from Gajara Bahara Station to Dhirauli Coal Mine at District Singrauli, Madhya Pradesh by Mahan Energen Limited |
|---|---|
| Status | Forest land use approved |
| Status since | 29 Jun 2026 |
| Application filed | 9 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Mahan Energen Limited |
| Land area | 1,166.6 acres (472.1 ha) |
| Forest land | 38.1 acres (15.4 ha) |
| Project cost | ₹850 crore |
| Village / locality | Mohanban R F |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10381 |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohanban R F, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Singrouli — forest land use approved, 1.3 km away
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Singrouli — lapsed, 1.3 km away
- Dhirauli North Coal Block — lapsed, 2.8 km away
- Dhirauli North Coal Block — lapsed, 2.8 km away
- Bharti Airtel Ltd. 5G OFC Project Adani Enterprises to Mahan Energen limited… — forest land use approved, 3.2 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 3.6 km away
- Bandhaura to Dhirauli (Connecting Rajmilan MDR 16 no. to Dongari) — forest land use approved, 4.2 km away
- Bandhaura to Dhirauli (Connecting Rajmilan MDR 16 no. to Dongari) — lapsed, 4.2 km away
More from Mahan Energen Limited in Singrauli
- Mara II Mahan Coal Mine — under forest review
- Mara II Mahan Coal Mine — lapsed
- Mara II Mahan Coal Mine — forest land use approved
- Gondbahera Ujheni East Coal Mine — environmental approval granted
- Long Belt Conveyer from Dhirauli Coal Mine to Mahan TPP by Mahan Energen Limited — forest land use approved
- Mara II Mahan Coal Mine — lapsed
All 13 Mahan Energen projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.