Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal Road Authority Ghun Ghuti-Sohagpur Route Dfo South Shahdol is an approved road project in Amgar, Pali, Umaria, Madhya Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 22 Aug 2023), as of 27 Nov 2026.
Where is it?
In Amgar, Pali, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹16 lakh; a site of 2 acres and 1.1 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 22 Jun 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Aug 2023 |
| Application filed | 22 Jun 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 2 acres (0.8 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Amgar |
| Taluk / tehsil | Pali |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11221 |
In context
15 applications in Umaria since January 2022 are in the same category (Roads & highways): 4 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 2 acres, this one is smaller than 62% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amgar, Pali, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Clearance in Baghannara Gram Panchayat Chandpur Block Pali for… — lapsed, 1.4 km away
- Marwatola II coal mine — in-principle approval, conditions pending, 3.1 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 3.2 km away
- Marwatola VII Coal Mine (Area: 1200 Ha) with Coal Production Capacity by… — environmental approval granted, 4.3 km away
- Marwatola VII Coal Mine (Area: 1200 Ha) with Coal Production Capacity by… — cleared for impact study, 4.3 km away
- Marwatola VII Coal Mine (Area: 1200 Ha) with Coal Production Capacity by… — cleared for impact study, 4.3 km away
- Marwatola VII Coal Mine (Area: 1200 Ha) with Coal Production Capacity by… — cleared for impact study, 4.3 km away
- Marwatola-Vii Coal Mine — in-principle approval, conditions pending, 4.3 km away
More from Jio Digital Fibre Private LTD in Umaria
- Jio Digital Fiber Pvt Ltd OFC 5G Project in ROW Corridor of Principal road… — more information requested
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — more information requested
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — more information requested
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — decision issued
12 Jio Digital Fibre projects in Umaria
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.