Quick answers
What is Bandha North Coal Mine?
Bandha North Coal Mine is an approved mining project in Majhaull, Deosar, Singrauli, Madhya Pradesh. The site covers 2,229.6 acres.
Who is building it?
The applicant is Jaiprakash Power Ventures Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 May 2026), as of 27 Nov 2026.
Where is it?
In Majhaull, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹62.4 crore; a site of 2,229.6 acres and 2,223.9 acres (900 ha) of forest land.
When was it filed?
The application was filed on 19 Jun 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 6 May 2026 |
| Application filed | 19 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Jaiprakash Power Ventures Limited |
| Land area | 2,229.6 acres (902.3 ha) |
| Forest land | 2,223.9 acres (900 ha) |
| Project cost | ₹62.4 crore |
| Village / locality | Majhaull |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11325 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2,229.6 acres, this one is larger than 82% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Majhaull, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bandha North Coal Mine — lapsed, 400 m away
- Bandha North Coal Mine — lapsed, 650 m away
- Gondbahera Ujheni East Coal Mine — environmental approval granted, 3.1 km away
- Gondbahera Ujheni East Coal Mine — forest land use approved, 3.1 km away
- Gondbahera Ujheni East Coal Mine — cleared for impact study, 3.1 km away
- Expansion of production from 2.80 to 3.92 MTPA of Amelia (North) Coal Mine — environmental approval granted, 3.3 km away
- Gondbahera Ujheni East Coal Mine — forest land use approved, 3.4 km away
- Bandha Coal Mine — environmental approval granted, 3.8 km away
More from Jaiprakash Power Ventures Limited in Singrauli
- Bandha North Coal Mine — lapsed
- Bandha North Coal Mine — lapsed
- Environmental Clearance for the Proposed JPVL Coal Washery Plant — not approved
- Expansion of production from 2.80 to 3.92 MTPA of Amelia (North) Coal Mine — environmental approval granted
- Environmental Clearance for the Proposed JPVL Coal Washery Plant — cleared for impact study
All 6 Jaiprakash Power Ventures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.