Quick answers
What is this project?
Environmental Clearance for the Proposed JPVL Coal Washery Plant is a rejected mining project in Majhaull, Deosar, Singrauli, Madhya Pradesh. The site covers 31.9 acres.
Who is building it?
The applicant is Jaiprakash Power Ventures Limited.
Has it been approved?
No. The application was rejected on 16 Apr 2026.
Where is it?
In Majhaull, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹34 crore and a site of 31.9 acres.
When was it filed?
The application was filed on 13 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for the Proposed JPVL Coal Washery Plant
Project details
| Status | Not approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 13 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jaiprakash Power Ventures Limited |
| Land area | 31.9 acres (12.9 ha) |
| Project cost | ₹34 crore |
| Village / locality | Majhaull |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05856 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 May 2025 (this page) | Not approved | 31.9 acres | ₹34 crore |
| Early planning filed 29 Jun 2023 | Cleared for impact study | 31.9 acres | ₹34 crore |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 31.9 acres, this one is larger than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Majhaull, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for the Proposed JPVL Coal Washery Plant — cleared for impact study, 0 m away
- Gond Deosar Multi Village Rural Water Supply Scheme — forest land use approved, 3 km away
- Gond Deosar Multi Village Rural Water Supply Scheme — forest land use approved, 3 km away
- Gond Deosar Multi Village Rural Water Supply Scheme — forest land use approved, 4.4 km away
- Package No. MP50PMJM22 road from Khanduli Kusedi to Bandha road — initial checks, 7.9 km away
- Gurbara North Coal Block — more information requested, 8.7 km away
- Inguri-B Coal Block, Main Basin Coalfield — forest land use approved, 9.6 km away
- Kari Sand Quarry — environmental approval granted, 12.3 km away
More from Jaiprakash Power Ventures Limited in Singrauli
- Bandha North Coal Mine — lapsed
- Bandha North Coal Mine — lapsed
- Expansion of production from 2.80 to 3.92 MTPA of Amelia (North) Coal Mine — environmental approval granted
- Bandha North Coal Mine — forest land use approved
All 6 Jaiprakash Power Ventures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.