Quick answers
What is this project?
Reconnaissance Survey (G-4) for Graphite and associated mineralisation in Phandka-Gatakhera area, Betul district, Madhya Pradesh is an approved mining project in Dangwa, Ghoda Dongri, Betul, Madhya Pradesh. The site covers 5,725.4 acres.
Who is building it?
The applicant is Vardan Environet LLP.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Mar 2026), as of 27 Nov 2026.
Where is it?
In Dangwa, Ghoda Dongri, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 5,725.4 acres and 2,399.8 acres (971.2 ha) of forest land.
When was it filed?
The application was filed on 15 Jan 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Mar 2026 |
| Application filed | 15 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Vardan Environet LLP |
| Land area | 5,725.4 acres (2,317 ha) |
| Forest land | 2,399.8 acres (971.2 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Dangwa |
| Taluk / tehsil | Ghoda Dongri |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11328 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 5,725.4 acres, this one is larger than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dangwa, Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project — lapsed, 750 m away
- Bsnl 4g Saturation Project — lapsed, 2.8 km away
- Bsnl 4g Saturation Project — forest land use approved, 3.7 km away
- Bsnl 4g Saturation Project — lapsed, 3.9 km away
- Diversion of 8.6 Hectare Forest Land at Westward Downstream of Old Ash Pond… — more information requested, 4.9 km away
- Diversion of 373 Hectare (Old Ash pond) Ash pond land for installation of 200… — more information requested, 5.3 km away
- Development of Samudayik Kendra at Mokshdham — lapsed, 6 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 6.1 km away
More from Vardan Environet LLP in Betul
- Preliminary Exploration (G3) for Graphite and associated mineralization in… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.