Quick answers
What is Pipe Laying Work of Doomarkachhar Water Supply?
Pipe Laying Work of Doomarkachhar Water Supply is a lapsed water and irrigation project in Bangaon, Kotma, Anuppur, Madhya Pradesh. It seeks 1.7 acres of forest land.
Who is building it?
The applicant is Housing & Urban Development Corporation Limited.
Has it been approved?
No. The application was lapsed on 16 Nov 2026, so it is no longer under consideration.
Where is it?
In Bangaon, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4.3 crore and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 14 Oct 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 14 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Housing & Urban Development Corporation Limited |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹4.3 crore |
| Village / locality | Bangaon |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11397 |
In context
6 applications in Anuppur since January 2022 are in the same category (Water & irrigation): 2 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bangaon, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Used Water Management under sbm urabn 2.0 — lapsed, 950 m away
- Construction of Fulsay Dafai To Paw Mohalla Approch CC Road — forest land use approved, 1.8 km away
- Under Amrut 2.0 Scheme Overhead Tank — lapsed, 2 km away
- Kaya Kalp 1.O Bt Road From Police Station to Main Road — lapsed, 2.3 km away
- Bhalmudi Rajnagar Road Length 4.60 KM — lapsed, 2.9 km away
- South Side of Jhiria West OCP — lapsed, 3.6 km away
- Amrut2.0 Dola — lapsed, 4.5 km away
- Naktitola Quarry Lease — lapsed, 5.4 km away
More from Housing & Urban Development Corporation Limited in Anuppur
- Construction of Fulsay Dafai To Paw Mohalla Approch CC Road — forest land use approved
All 41 Housing & Urban Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.