Quick answers
What is this project?
33 K.V electric power transmission line from village Khaira Tigaila (Albeli Patharguva) to Rampura Niwavari is a lapsed power project in Khera P F, Khargapur, Tikamgarh, Madhya Pradesh. The site covers 16.5 acres.
Who is building it?
The applicant is Amit Bhushan.
Has it been approved?
No. The application was lapsed on 19 Mar 2025, so it is no longer under consideration.
Where is it?
In Khera P F, Khargapur, Tikamgarh, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.4 crore; a site of 16.5 acres and 3.7 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 17 Feb 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Mar 2025 |
| Application filed | 17 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Amit Bhushan |
| Land area | 16.5 acres (6.7 ha) |
| Forest land | 3.7 acres (1.5 ha) |
| Project cost | ₹2.4 crore |
| Village / locality | Khera P F |
| Taluk / tehsil | Khargapur |
| District | Tikamgarh |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11421 |
Where it is
Khera P F, Khargapur, Tikamgarh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33 K.V electric power transmission line from village Khaira Tigaila (Albeli… — forest land use approved, 1.6 km away
- Gudhapali Pyrophyllite and Diaspore Mine — lapsed, 6.6 km away
- Gudapali Pyrophyllite & Diaspore mine — under environmental review, 7.8 km away
- Gudapali Pyrophyllite and Diaspore Mine — lapsed, 7.8 km away
- Khargapur Murrum Quarry — lapsed, 10.9 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 11.9 km away
- Improvement of Water Supply Project at Khargapur and Jatara under Tikamgarh… — initial checks, 12.2 km away
- Tanga Sand Quarry — environmental approval granted, 12.7 km away
More from Amit Bhushan in Tikamgarh
- 33 K.V electric power transmission line from village Khaira Tigaila (Albeli… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.