Quick answers
What is Bsnl 4g Saturation Project?
Bsnl 4g Saturation Project is a lapsed project in Kadla, Baihar, Balaghat, Madhya Pradesh. It seeks 0 acres of forest land.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
No. The application was lapsed on 2 Jan 2024, so it is no longer under consideration.
Where is it?
In Kadla, Baihar, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and 200 m² of forest land.
When was it filed?
The application was filed on 28 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Jan 2024 |
| Application filed | 28 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Bharat Sanchar Nigam Limited |
| Forest land | 200 m² |
| Project cost | ₹10 lakh |
| Village / locality | Kadla |
| Taluk / tehsil | Baihar |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11456 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Aug 2023 (this page) | Lapsed | ₹10 lakh | |
| New project filed 18 Jul 2023 | More information requested | ₹10 lakh |
In context
31 applications in Balaghat since January 2022 are in the same category (Other): 6 approved, 18 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval.
Where it is
Kadla, Baihar, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project — more information requested, 0 m away
- Bsnl 4g Lwe Mha Project (Forest Camp Adawar) — under forest review, 5.3 km away
- Bsnl 4g Lwe Mha Project (Forest Camp Adawar) — under wildlife review, 5.3 km away
- Laying New 11KV Feeder Under Rdss Scheme — lapsed, 8.5 km away
- Constriction of Road From Amatola To Ghursibehra in PMJANMAN SCHEAM — initial checks, 10.3 km away
- Bsnl 4g Lwe Mha Project (Forest Camp Bamhani Dadar) — under forest review, 10.9 km away
- Bsnl 4g Lwe Mha Project (Forest Camp Bamhani Dadar) — under wildlife review, 11 km away
- Road From Village Moharai To Baigatola — lapsed, 11.1 km away
More from Bharat Sanchar Nigam Limited in Balaghat
- Amended Bharat Net/BSNL Linear UG OFC laying Project in Waraseoni Block, DFO… — in-principle approval, conditions pending
- Amended Bharat Net/BSNL Linear UG OFC laying Project in KATANGI Block, DFO SOUTH — lapsed
- Amended Bharat Net/BSNL Linear UG OFC laying Project in LALBARRA Block, DFO… — lapsed
- Amended Bharat Net/BSNL Linear UG OFC laying Project in KATANGI Block, DFO SOUTH — lapsed
- Amended Bharat Net/BSNL Linear UG OFC laying Project in LALBARRA Block, DFO… — lapsed
- Amended Bharat Net/BSNL Linear UG OFC laying Project in Lanji Block, DFO South… — more information requested
19 Bharat Sanchar Nigam (BSNL) projects in Balaghat
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.