Quick answers
What is 4G Saturation Project- MAL KEDIYA?
4G Saturation Project- MAL KEDIYA is an approved telecom project in Kundiya, Bagli, Dewas, Madhya Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Raj Soni.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Feb 2024), as of 27 Nov 2026.
Where is it?
In Kundiya, Bagli, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹8 lakh; a site of 0.6 acres and 2,400 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 6 Feb 2024 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Raj Soni |
| Land area | 2,600 m² |
| Forest land | 2,400 m² |
| Project cost | ₹8 lakh |
| Village / locality | Kundiya |
| Taluk / tehsil | Bagli |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11516 |
In context
20 applications in Dewas since January 2022 are in the same category (Telecom): 12 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.6 acres, this one is smaller than 67% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kundiya, Bagli, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Government of India- 4G Saturation Project - MAL KEDIYA — lapsed, 0 m away
- Pipari - Torniya Road — more information requested, 6 km away
- Polakhal Marble Stone Quarry; Quarry Lease Area- 4.0 ha, Production… — environmental approval granted, 13.1 km away
- Polakhal Marble Stone Quarry; Quarry Lease Area- 4.0 ha, Production… — cleared for impact study, 13.1 km away
- Polakhal Marble Quarry — cleared for impact study, 13.1 km away
- Polakhal Marble Quarry — lapsed, 13.1 km away
- Polakhal Marble, Low-grade Lime & Subgrade Mineral Quarry — lapsed, 13.2 km away
- Polakhal Marble, Low-grade Lime & Subgrade Mineral Quarry — cleared for impact study, 13.2 km away
More from Raj Soni in Dewas
- Government of India- 4G Saturation Project - Magaradeh — lapsed
- Government of India- 4G Saturation Project - BADCHHAPRA — lapsed
- Government of India- 4G Saturation Project -Semlinarwada — lapsed
- Government of India- 4G Saturation Project - MAL KEDIYA — lapsed
- Government of India- 4G Saturation Project - Premgarh — lapsed
- Government of India- 4G Saturation Project - Patadipala — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.