Quick answers
What is this project?
Diversion of Forest Land Under FCA 1980 for Construction of Samnapur- Gadasarai Road is an approved road project in Bargi, Dindori, Madhya Pradesh. The site covers 81.3 acres.
Who is building it?
The applicant is Mprdc Jabalpur Division.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 May 2026), as of 27 Nov 2026.
Where is it?
In Bargi, Dindori, Madhya Pradesh.
How big is it?
It has a stated cost of ₹53.3 crore; a site of 81.3 acres and 15.3 acres (6.2 ha) of forest land.
When was it filed?
The application was filed on 23 Jul 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 May 2026 |
| Application filed | 23 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mprdc Jabalpur Division |
| Land area | 81.3 acres (32.9 ha) |
| Forest land | 15.3 acres (6.2 ha) |
| Project cost | ₹53.3 crore |
| Village / locality | Bargi |
| Taluk / tehsil | Dindori |
| District | Dindori |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11604 |
In context
6 applications in Dindori since January 2022 are in the same category (Roads & highways): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Bargi, Dindori, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dindori Multi Village Water Supply Scheme (Oht&ips) — forest land use approved, 5.3 km away
- DINDORI MULTI VILLAGE WATER SUPPLY SCHEME (PIPELINE IN RoW) — forest land use approved, 8.6 km away
- Dindori Multi Village Water Supply Scheme — lapsed, 9.7 km away
- Amended Bharat Net/BSNL Linear UG OFC laying Project in Samnapur Block, DFO… — initial checks, 10 km away
- Pipariyamal West Bauxite Block — under forest review, 10.2 km away
- 41.63ha Pipariyamal West Bauxite Block — cleared for impact study, 10.2 km away
- Jhanki Mal Crusher Stone Temporary Permit Quarry — lapsed, 10.2 km away
- Shivri Murrum & Crusher Stone Temporary Permit — environmental approval granted, 10.6 km away
More from Mprdc Jabalpur Division in Dindori
- Diversion of Forest Land Under FCA 1980 for Construction and Widening of… — more information requested
- Diversion of Forest Land Under FCA 1980 for Construction of Mehndwani Chakdehi… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.