What is Bsnl 4g Saturation Project?
Bsnl 4g Saturation Project is an approved telecom project in Gada Gohan, Bhainsdehi, Betul, Madhya Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2025), as of 27 Nov 2026.
Where is it?
In Gada Gohan, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 lakh; a site of 0.1 acres and 300 m² of forest land.
When was it filed?
The application was filed on 9 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2025 |
| Application filed | 9 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Land area | 300 m² |
| Forest land | 300 m² |
| Project cost | ₹12 lakh |
| Village / locality | Gada Gohan |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11616 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 12 Feb 2025 | Lapsed | 0.1 acres | ₹12 lakh |
| Change of use filed 9 Sept 2023 (this page) | Forest land use approved | 0.1 acres | ₹12 lakh |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.1 acres, this one is smaller than 77% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gada Gohan, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project — lapsed, 0 m away
- Bsnl 4g Saturation Project — lapsed, 1.8 km away
- 4g Saturation Project 500 Days — lapsed, 2 km away
- 4g Saturation 500 Days Project Work — lapsed, 2 km away
- 4g Saturation Project 500 Days — lapsed, 2 km away
- Bsnl 4g Saturation Project — lapsed, 2.9 km away
- Construction of 132 KV Gudgaon- Patraiyat DCDS transmission Line — under wildlife review, 7.2 km away
- Khapa Veeran Crusher Stone Quarry of Smt Aarti Jaiswal — environmental approval granted, 7.9 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
- 4g Saturation Project 5oo Days Project- at Ladi, Theska, Nadha, Banoor,… — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.