One of 2 filings for this project. The project's main page, with every filing and where each stands: Shifting of 400 KV D/c Damoh-Bhopal Transmission Line due to Jera Medium Irrigation…
Project details
| Official title | Shifting of 400 KV D/c Damoh-Bhopal Transmission Line due to Jera Medium Irrigation Project in Tehsil-Jaisingh nagar , District-Sagar (MP) |
|---|---|
| Status | Lapsed |
| Status since | 11 May 2025 |
| Application filed | 5 Apr 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 1,243.2 acres (503.1 ha) |
| Forest land | 17.1 acres (6.9 ha) |
| Project cost | ₹21.6 crore |
| Village / locality | Jotpur |
| Taluk / tehsil | Sagar |
| District | Sagar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11733 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Apr 2026 | Under forest review | 1,243.2 acres | ₹21.6 crore |
| Change of use filed 5 Apr 2025 (this page) | Lapsed | 1,243.2 acres | ₹21.6 crore |
In context
13 applications in Sagar since January 2022 are in the same category (Power): 5 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 1,243.2 acres, this one is larger than 75% of them.
Where it is
Jotpur, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shifting of 400 KV D/c Damoh-Bhopal Transmission Line due to Jera Medium… — under forest review, 0 m away
- Bharat net OFC Cable Jaisinagar-sultanganj part 2 — lapsed, 6 km away
- Bharatnet Ofc Cable Jaisinagar-Sultanganj Part1 — lapsed, 6.7 km away
- Kandela Minor Irrigation Project — under forest review, 10.6 km away
- Jera Medium Irrigation Project — environmental approval granted, 12.4 km away
- Jera Medium Irrigation Project — forest land use approved, 12.4 km away
- 4G saturation BTS Kali Pathar — lapsed, 15.7 km away
- BSNL 4G saturation BTS Kali Pathar — more information requested, 15.7 km away
More from Power Grid Corporation of India (POWERGRID) in Sagar
- Shifting of Various 400 KV and 765 KV Lines Due to Upcoming Banda Irrigation… — forest land use approved
3 Power Grid Corporation of India projects in Sagar
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.