Quick answers
What is this project?
UNDERGROUND OFC LAYING WORK FOR 4G SATURATION,MISSION-500 FROM BAMNAI GP to Delawadi 4G site is a proposed telecom project in R E H T I R E S E R V E D F O *, Rehti, Sehore, Madhya Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Pgmtd Bsnl Bhopal.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In R E H T I R E S E R V E D F O *, Rehti, Sehore, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 11 Mar 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Mar 2024 |
| Application filed | 11 Mar 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Pgmtd Bsnl Bhopal |
| Land area | 1,100 m² |
| Project cost | ₹2 lakh |
| Village / locality | R E H T I R E S E R V E D F O * |
| Taluk / tehsil | Rehti |
| District | Sehore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11886 |
In context
8 applications in Sehore since January 2022 are in the same category (Telecom): 2 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
R E H T I R E S E R V E D F O *, Rehti, Sehore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Khajuri Micro Lift Irrigation Scheme — under forest review, 7 km away
- Mathar Pipe Water Supply Scheme at Block Budni Distt. Sehore — more information requested, 7.4 km away
- Mathar Pipe Water Supply Scheme at Block Budni Distt. Sehore — lapsed, 7.4 km away
- Semri Stone Quarry — under environmental review, 9.3 km away
- Semri Stone (Gitti) Quarry — environmental approval granted, 9.5 km away
- Semri Stone Quarry — environmental approval granted, 9.8 km away
- Khajuri Micro Lift Irrigation Scheme — under wildlife review, 11.5 km away
- Khajuri Micro Lift Irrigation Scheme — more information requested, 11.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.