Quick answers
What is this project?
Proposed Stand-alone 2.0 MTPA Coal washery based on Batac Jig process located in 9..604 Ha area as a standalone washery at Anuppur, District Anuppur, Madhya Pradesh by Adinath Coal Beneficiation Pvt. Ltd is a proposed mining project in Dhiraul, Anuppur, Madhya Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is ADINATH cOAL bENEFICIATION PRIVATE LIMITED.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dhiraul, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹11 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 10 Nov 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 12 Nov 2026 |
| Application filed | 10 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | ADINATH cOAL bENEFICIATION PRIVATE LIMITED |
| Land area | 2,900 m² |
| Project cost | ₹11 crore |
| Village / locality | Dhiraul |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12258 |
In context
134 applications in Anuppur since January 2022 are in the same category (Mining): 45 approved, 29 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.7 acres, this one is smaller than 98% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dhiraul, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Stand-alone 2.0 MTPA Coal washery based on Batac Jig process located… — cleared for impact study, 0 m away
- Wall Around Sangma Railway Siding to Protect Green Forest From Pollution… — under forest review, 2.3 km away
- Work of New 33/11 KV Substation — lapsed, 3.3 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 3.7 km away
- Construction of 1x660 MW Super Critical Thermal Power Plant — forest land use approved, 5 km away
- Construction of 1x660 MW Super Critical Thermal Power Plant. — lapsed, 5.1 km away
- 1x660 MW Amarkantak Ultra Supercritical Thermal Power Project — withdrawn, 5.2 km away
- 1x660 MW Amarkantak Ultra Supercritical Thermal Power Project — environmental approval granted, 5.2 km away
More from ADINATH cOAL bENEFICIATION PRIVATE LIMITED in Anuppur
- Proposed Stand-alone 2.0 MTPA Coal washery based on Batac Jig process located… — cleared for impact study
About this information