Quick answers
What is this project?
Wall Around Sangma Railway Siding to Protect Green Forest From Pollution Created Due to Loading and Unloading of Crushed Coal at Atps, Chachai is a proposed railway project in Sanghwa, Anuppur, Madhya Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Chief Engineer (Generation) Atps, Mppgcl Chachai.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Sanghwa, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore; a site of 49.4 acres and 2,700 m² of forest land.
When was it filed?
The application was filed on 28 May 2026.
Project details
| Official title | Construction of Wall Around Sangma Railway Siding to Protect Green Forest From Pollution Created Due to Loading and Unloading of Crushed Coal at Atps, Chachai |
|---|---|
| Status | Under forest review |
| Status since | 18 Nov 2026 |
| Application filed | 28 May 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Railways & metro |
| Applicant | Chief Engineer (Generation) Atps, Mppgcl Chachai |
| Land area | 49.4 acres (20 ha) |
| Forest land | 2,700 m² |
| Project cost | ₹1.4 crore |
| Village / locality | Sanghwa |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10993 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanghwa, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Stand-alone 2.0 MTPA Coal washery based on Batac Jig process located… — more information requested, 2.3 km away
- Proposed Stand-alone 2.0 MTPA Coal washery based on Batac Jig process located… — cleared for impact study, 2.3 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 3.6 km away
- Work of New 33/11 KV Substation — lapsed, 5.1 km away
- Construction of 1x660 MW Super Critical Thermal Power Plant — forest land use approved, 5.7 km away
- Construction of 1x660 MW Super Critical Thermal Power Plant. — lapsed, 5.9 km away
- Obtaining Environmental Clearance under Clause 7(ii)(a) of the EIA… — under environmental review, 6.4 km away
- 1x660 MW Amarkantak Ultra Supercritical Thermal Power Project — withdrawn, 6.4 km away
More from Chief Engineer (Generation) Atps, Mppgcl Chachai in Anuppur
- Ridiversion of 1.7827 Ha of Forest Land for Laying of Water Pipe Line and… — more information requested
- Construction of 1x660 MW Super Critical Thermal Power Plant — forest land use approved
- Construction of 1x660 MW Super Critical Thermal Power Plant. — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.