What is Widening of Approach Road to Thliarpui Wrc Area at Mat River?
Widening of Approach Road to Thliarpui Wrc Area at Mat River is a lapsed road project in Sailam, Aibawk, Aizawl, Mizoram. It seeks 0.4 acres of forest land.
Who is building it?
The applicant is Thliarpuizau Farm Management Committee.
Has it been approved?
No. The application was lapsed on 27 Mar 2023, so it is no longer under consideration.
Where is it?
In Sailam, Aibawk, Aizawl, Mizoram.
How big is it?
It has a stated cost of ₹25 lakh and 1,500 m² of forest land.
When was it filed?
The application was filed on 27 Mar 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Widening of Approach Road to Thliarpui Wrc Area at Mat River
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Mar 2023 |
| Application filed | 27 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Thliarpuizau Farm Management Committee |
| Forest land | 1,500 m² |
| Project cost | ₹25 lakh |
| Village / locality | Sailam |
| Taluk / tehsil | Aibawk |
| District | Aizawl |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00033 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Mar 2023 (this page) | Lapsed | ₹25 lakh | |
| New project filed 24 Jan 2023 | Lapsed | 0.4 acres | ₹25 lakh |
| New project filed 22 Nov 2022 | Forest land use approved | 0.4 acres | ₹25 lakh |
In context
14 applications in Aizawl since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 8 withdrawn, lapsed or rejected.
Where it is
Sailam, Aibawk, Aizawl, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening of Approach Road to Thliarpui Wrc Area at Mat River — lapsed, 300 m away
- Widening of Approach Road to Thliarpui Wrc Area at Mat River — forest land use approved, 300 m away
- Solid Waste Management Center — more information requested, 40.8 km away
- Construction of Aizawl By-pass on Western Side — more information requested, 44.2 km away
- Establishment of Camp and Work Shed on a Temporary Basis — more information requested, 46.1 km away
- 2 Lane Aizawl Bypass NH-6 PKG-3 — lapsed, 46.2 km away
- 2 Lane Aizawl Bypass NH-6 PKG-3 — lapsed, 46.2 km away
- Mizoram State Super-Specialty Cancer and Research Centre — under environmental review, 47.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.