Quick answers
What is Construction of Aizawl By-pass on Western Side?
Construction of Aizawl By-pass on Western Side is a proposed road project in Kelsih, Aibawk, Aizawl, Mizoram. The site covers 41,341.4 acres.
Who is building it?
The applicant is Project Implementation Unit, PWD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kelsih, Aibawk, Aizawl, Mizoram.
How big is it?
It has a stated cost of ₹500 crore; a site of 41,341.4 acres and 24.2 acres (9.8 ha) of forest land.
When was it filed?
The application was filed on 20 May 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Sept 2026 |
| Application filed | 20 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Project Implementation Unit, PWD |
| Land area | 41,341.4 acres (16,730.3 ha) |
| Forest land | 24.2 acres (9.8 ha) |
| Project cost | ₹500 crore |
| Village / locality | Kelsih |
| Taluk / tehsil | Aibawk |
| District | Aizawl |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00035 |
In context
14 applications in Aizawl since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 8 withdrawn, lapsed or rejected.
Where it is
Kelsih, Aibawk, Aizawl, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mizoram State Super-Specialty Cancer and Research Centre — under environmental review, 8.6 km away
- Mizoram State Super-Specialty Cancer and Research Centre — withdrawn, 8.6 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — more information requested, 10.6 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — lapsed, 10.6 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — not approved, 10.9 km away
- Diversion of Around 0.97 Ha of Forest Land for Construction of Approach Road… — more information requested, 10.9 km away
- 2 lane of Aizawl Bypass NH-06 including Tunnel (Connecting Sairang to Seling)… — forest land use approved, 11 km away
- Twin Tube Uni-Directional Aizawl Bypass Tunnel of 2.5 Km and Its Approaches of… — lapsed, 11.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.