Project details
| Status | More information requested |
|---|---|
| Status since | 20 Aug 2024 |
| Application filed | 25 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Lalramthanga Siakeng Ralte |
| Land area | 15.1 acres (6.1 ha) |
| Forest land | 15.1 acres (6.1 ha) |
| Project cost | ₹28.8 crore |
| Village / locality | New Belkhai (Tuikawi) |
| Taluk / tehsil | West Bunghmun |
| District | Lunglei |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00076 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Aug 2023 (this page) | More information requested | 15.1 acres | ₹28.8 crore |
| New project filed 13 Apr 2023 | Lapsed | ₹28.8 crore |
In context
16 applications in Lunglei since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. At 15.1 acres, this one is smaller than 79% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
New Belkhai (Tuikawi), West Bunghmun, Lunglei, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction & Maintainance of Sumasumi to Tuikawi Road — more information requested, 0 m away
- Construction & Maintenance of Sumasumi to Tuikawi Road — withdrawn, 0 m away
- Construction & Maintenance of Sumasumi toTuikawi Road — lapsed, 0 m away
- Construction and Maintenance of Sumasumi to Tuikawi — under forest review, 300 m away
- Construction and Maintenance of Sumasumi to Tuikawi — withdrawn, 300 m away
- Construction & Maintenance of Sachan to Sumasumi Road — lapsed, 5.7 km away
- Construction & Maintenance of Sachan to Sumasumi Road — under forest review, 9.7 km away
- Construction & Maintenace of Sachan to Sumasumi Road — withdrawn, 9.8 km away
More from Lalramthanga Siakeng Ralte in Lunglei
- Construction and Maintenance of Sumasumi to Tuikawi — under forest review
- Construction & Maintenance of Sachan to Sumasumi Road — under forest review
- Construction & Maintenance of Sachan to Sumasumi Road — withdrawn
- Construction and Maintenance of Sumasumi to Tuikawi — withdrawn
- Construction & Maintenace of Sachan to Sumasumi Road — withdrawn
- Construction & Maintenance of Sumasumi to Tuikawi Road — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.