What is Developing? Open the mapMap

WithdrawnRoads & highways · Lunglei, Mizoram

Construction & Maintenance of Sumasumi to Tuikawi Road

Construction & Maintenance of Sumasumi to Tuikawi Road is a withdrawn road project in New Belkhai (Tuikawi), West Bunghmun, Lunglei, Mizoram. The site covers 16 acres. Its stated project cost is ₹28.8 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 19 Nov 2026).

See it on the live map All projects in Lunglei

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusWithdrawn
Status since19 Nov 2026
Application filed24 Aug 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantLalramthanga Siakeng Ralte
Land area16 acres (6.5 ha)
Forest land15.1 acres (6.1 ha)
Project cost₹28.8 crore
Village / localityNew Belkhai (Tuikawi)
Taluk / tehsilWest Bunghmun
DistrictLunglei
StateMizoram
Location fromSite boundary on record
Our referenceWID-MZ-00097

In context

16 applications in Lunglei since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. At 16 acres, this one is smaller than 71% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

New Belkhai (Tuikawi), West Bunghmun, Lunglei, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.