Quick answers
What is Dampa Rengpuilui Maj Pmt Bridge at Km 127.270?
Dampa Rengpuilui Maj Pmt Bridge at Km 127.270 is a proposed road project in Tuichar, West Phaileng, Mamit, Mizoram. The site covers 0.3 acres.
Who is building it?
The applicant is Bro (Gref), Pushpak.
Has it been approved?
Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.
Where is it?
In Tuichar, West Phaileng, Mamit, Mizoram.
How big is it?
It has a stated cost of ₹2.3 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 23 Jan 2023.
Project details
| Status | Application filed |
|---|---|
| Status since | 23 Jan 2023 |
| Application filed | 23 Jan 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bro (Gref), Pushpak |
| Land area | 1,300 m² |
| Project cost | ₹2.3 crore |
| Village / locality | Tuichar |
| Taluk / tehsil | West Phaileng |
| District | Mamit |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00105 |
In context
14 applications in Mamit since January 2022 are in the same category (Roads & highways): 1 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 0.3 acres, this one is larger than 54% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tuichar, West Phaileng, Mamit, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dampa Rengpui Maj Pmt Bridge — decision issued, 0 m away
- Dampalui Maj Pmt Bridge — decision issued, 0 m away
- Dampa Lui Maj Pmt Bridge at Km 121.730 — more information requested, 200 m away
- Dampoli Maj Pmt Bridge at Km 121.730 — application filed, 2.1 km away
- Dampa Rengpui Lui Maj Pmt Bridge at Km 127.270 — more information requested, 2.2 km away
- Ansurilui Maj Pmt Bridge at Km 156.120 — application filed, 10.1 km away
- Ansuri Lui Maj Pmt Bridge at Km 156.120 — more information requested, 10.1 km away
- Mining GSB from TUT riverbank to Construction site at Sairang — lapsed, 13.6 km away
More from Bro (Gref), Pushpak in Mamit
- Dampoli Maj Pmt Bridge at Km 121.730 — application filed
- Ansurilui Maj Pmt Bridge at Km 156.120 — application filed
About this information