Quick answers
What is Dampa Lui Maj Pmt Bridge at Km 121.730?
Dampa Lui Maj Pmt Bridge at Km 121.730 is a proposed road project in Damparengpui, Reiek, Mamit, Mizoram. The site covers 0 acres.
Who is building it?
The applicant is Ministry of Defense.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Damparengpui, Reiek, Mamit, Mizoram.
How big is it?
It has a stated cost of ₹3 crore and a site of 0 acres.
When was it filed?
The application was filed on 5 Oct 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Oct 2023 |
| Application filed | 5 Oct 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Defense |
| Land area | 100 m² |
| Project cost | ₹3 crore |
| Village / locality | Damparengpui |
| Taluk / tehsil | Reiek |
| District | Mamit |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00107 |
In context
14 applications in Mamit since January 2022 are in the same category (Roads & highways): 1 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Damparengpui, Reiek, Mamit, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dampa Rengpui Maj Pmt Bridge — decision issued, 200 m away
- Dampa Rengpuilui Maj Pmt Bridge at Km 127.270 — application filed, 200 m away
- Dampalui Maj Pmt Bridge — decision issued, 200 m away
- Dampoli Maj Pmt Bridge at Km 121.730 — application filed, 2 km away
- Dampa Rengpui Lui Maj Pmt Bridge at Km 127.270 — more information requested, 2.3 km away
- Ansurilui Maj Pmt Bridge at Km 156.120 — application filed, 10.2 km away
- Ansuri Lui Maj Pmt Bridge at Km 156.120 — more information requested, 10.3 km away
- Mining GSB from TUT riverbank to Construction site at Sairang — lapsed, 13.5 km away
More from Ministry of Defense in Mamit
- Ansuri Lui Maj Pmt Bridge at Km 156.120 — more information requested
- Dampa Rengpui Lui Maj Pmt Bridge at Km 127.270 — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.