Quick answers
What is this project?
Grant of Ec of Sikhardevi River Sand Quarry Over an Area of 31.00 Acres Or 12.545 Hectares is an approved mining project in Sikhar, Naugaon, Jagatsinghapur, Odisha. The site covers 31 acres.
Who is building it?
The applicant is Tahasildar Naugaon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Oct 2022), as of 27 Nov 2026.
Where is it?
In Sikhar, Naugaon, Jagatsinghapur, Odisha.
How big is it?
It has a stated cost of ₹5 lakh and a site of 31 acres.
When was it filed?
The application was filed on 27 Oct 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Grant of Ec of Sikhardevi River Sand Quarry Over an Area of 31.00 Acres Or 12.545 Hectares
Project details
| Official title | Proposal for Grant of Ec of Sikhardevi River Sand Quarry Over an Area of 31.00 Acres Or 12.545 Hectares at Village-Sikhar, Tahasil-Naugaon, District-Jagatsinghpur, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Oct 2022 |
| Application filed | 27 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tahasildar Naugaon |
| Land area | 31 acres (12.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Sikhar |
| Taluk / tehsil | Naugaon |
| District | Jagatsinghapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00026 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 20 Mar 2024 | Environmental approval granted | 31 acres | ₹5 lakh |
| New project filed 27 Oct 2022 (this page) | Environmental approval granted | 31 acres | ₹5 lakh |
In context
48 applications in Jagatsinghapur since January 2022 are in the same category (Mining): 34 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 31 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sikhar, Naugaon, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grant of Ec of Sikhardevi River Sand Quarry Over an Area of 31.00 Acres Or… — environmental approval granted, 0 m away
- Submission of Replenishment Study Report Devi River Sand Quarry over an area… — environmental approval granted, 0 m away
- Amendment of EC of Bachhalo Devi Sand Bed over an area of 6.00 Acres or 2.428 ha — environmental approval granted, 3.9 km away
- 2/4 Laning With Paved Shoulder and NH Configuration Under Bharatmala… — cleared for impact study, 8.8 km away
- Grant of Ec of Erada Devi River Sand Bed Over an Area of 15.00 Acres Or 6.070… — environmental approval granted, 12.4 km away
- Application of Tor for Mining of Sand From Badaro Devi Nadi Sand Quarry About… — not approved, 13.2 km away
- Mundilo - Patenigaon Devi Nadi Sand Quarry (Under Clusterapproach) Is a Sand… — not approved, 22.5 km away
- District Survey Report(DSR) of River Sand (minor mineral), Jagatsinghpur… — environmental approval granted, 22.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.