Quick answers
What is this project?
Grant of Ec of Erada Devi River Sand Bed Over an Area of 15.00 Acres Or 6.070 Hectares is an approved mining project in Erada, Naugaon, Jagatsinghapur, Odisha. The site covers 15 acres.
Who is building it?
The applicant is Manoj Agrawalla.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jan 2025), as of 27 Nov 2026.
Where is it?
In Erada, Naugaon, Jagatsinghapur, Odisha.
How big is it?
It has a stated cost of ₹2.9 crore and a site of 15 acres.
When was it filed?
The application was filed on 22 Mar 2024.
Project details
| Official title | Proposal for Grant of Ec of Erada Devi River Sand Bed Over an Area of 15.00 Acres Or 6.070 Hectares at Village-Erada, Tahasil-Naugaon, District-Jagatsinghpur, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Jan 2025 |
| Application filed | 22 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manoj Agrawalla |
| Land area | 15 acres (6.1 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Erada |
| Taluk / tehsil | Naugaon |
| District | Jagatsinghapur |
| State | Odisha |
| Location from | Site area on record |
| Our reference | WID-OR-01392 |
In context
48 applications in Jagatsinghapur since January 2022 are in the same category (Mining): 34 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 15 acres, this one is larger than 54% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Erada, Naugaon, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application of Tor for Mining of Sand From Badaro Devi Nadi Sand Quarry About… — not approved, 800 m away
- Amendment of EC of Bachhalo Devi Sand Bed over an area of 6.00 Acres or 2.428 ha — environmental approval granted, 9.1 km away
- Mundilo - Patenigaon Devi Nadi Sand Quarry (Under Clusterapproach) Is a Sand… — not approved, 10.8 km away
- Submission of Replenishment Study Report Devi River Sand Quarry over an area… — environmental approval granted, 12.4 km away
- Grant of Ec of Sikhardevi River Sand Quarry Over an Area of 31.00 Acres Or… — environmental approval granted, 12.4 km away
- Grant of Ec of Sikhardevi River Sand Quarry Over an Area of 31.00 Acres Or… — environmental approval granted, 12.4 km away
- Widening and Strengthening to 2L+PS including LA from Km 318.970 to 353.450… — in-principle approval, conditions pending, 14.6 km away
- 2/4 Laning With Paved Shoulder and NH Configuration Under Bharatmala… — cleared for impact study, 16.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.