Project details
| Official title | Proposed Bauxite Mining with production capacity of 3.5 Million TPA by National Aluminium Company Limited (NALCO) in an area of 697.979 Ha in District Koraput, Odisha. |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Feb 2023 |
| Application filed | 3 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nalco |
| Land area | 1,724.7 acres (698 ha) |
| Project cost | ₹1,436.9 crore |
| Village / locality | Pottangi |
| Taluk / tehsil | Pottangi |
| District | Koraput |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00188 |
In context
151 applications in Koraput since January 2022 are in the same category (Mining): 96 approved, 14 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,724.7 acres, this one is larger than 95% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pottangi, Koraput, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Intake Water Pipeline Corridor for proposed Pottangi Bauxite Mines of… — forest land use approved, 2.3 km away
- Road from Pottangi Bauxite Mines to Alumina Refinery at Damanjodi — forest land use approved, 3.8 km away
- Application of EC for Production of 1.35 KLD Mohua Flower Based Out Still… — environmental approval granted, 4.2 km away
- Proposed Bauxite Mining with production capacity of 3.5 Million TPA by… — environmental approval granted, 8.9 km away
- Diversion of 48.2894 Ha of Additional Forest land (13,2933 Ha in Jeypore… — forest land use approved, 11.9 km away
- New Proporal for Fresh Ec of Mania (U. Mania) Stone Quarry-B Over an Area… — not approved, 13.8 km away
- Production Enhancement from 513 Cu.m per Year to 5040 Cu.m per Year from Mania… — environmental approval granted, 13.9 km away
- Transfer of EC of Mania Stone Quarry over an area of 2.50 Acres or 1.011 Ha — environmental approval granted, 14 km away
More from Nalco in Koraput
- Panchapatmali South Block Bauxite Mine over an area of 528.262 ha at: Vill:… — under environmental review
- Alumina Refinery NALCO — initial checks
- Panchapatmali South Block Bauxite Mine over an area of 528.262 ha at: Vill:… — lapsed
- Proposed Bauxite Mining with production capacity of 3.5 Million TPA by… — environmental approval granted
- Panchpatmali Central and North Block Bauxite Mine — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.