LapsedIndustry · Sundargarh, Odisha

Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA Throughput (1.16 MTPA High Grade Ore), Iron Ore Pelletization Plant – 1.2 MTPA And Producer Gas Plant – 27,000 Nm3/hr by M/s KAI International Private Limited

Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA Throughput (1.16 MTPA High Grade Ore), Iron Ore Pelletization Plant – 1.2 MTPA And Producer Gas Plant – 27,000 Nm3/hr by M/s KAI International Private Limited is a lapsed industrial project in Kapand, Lahunipara, Sundargarh, Odisha. The site covers 189.5 acres. Its stated project cost is ₹341.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Sundargarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA Throughput…

Project details

Official titleGreenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA Throughput (1.16 MTPA High Grade Ore), Iron Ore Pelletization Plant – 1.2 MTPA And Producer Gas Plant – 27,000 Nm3/hr Located At Village - Kapanda, Tehsil – Lahunipara, Dist. - Sundergarh, Odisha By M/s KAI International Private Limited
StatusLapsed
Status since29 Oct 2024
Application filed25 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKai International Private Limited
Land area189.5 acres (76.7 ha)
Project cost₹341.7 crore
Village / localityKapand
Taluk / tehsilLahunipara
DistrictSundargarh
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00358

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 25 Nov 2023 (this page)Lapsed189.5 acres₹341.7 crore
New project filed 14 Nov 2023Environmental approval granted189.5 acres₹341.7 crore

In context

57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 189.5 acres, this one is larger than 86% of them.

Where it is

Kapand, Lahunipara, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.