One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA Throughput…
Project details
| Official title | Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA Throughput (1.16 MTPA High Grade Ore), Iron Ore Pelletization Plant – 1.2 MTPA And Producer Gas Plant – 27,000 Nm3/hr Located At Village - Kapanda, Tehsil – Lahunipara, Dist. - Sundergarh, Odisha By M/s KAI International Private Limited |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 25 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kai International Private Limited |
| Land area | 189.5 acres (76.7 ha) |
| Project cost | ₹341.7 crore |
| Village / locality | Kapand |
| Taluk / tehsil | Lahunipara |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00358 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 25 Nov 2023 (this page) | Lapsed | 189.5 acres | ₹341.7 crore |
| New project filed 14 Nov 2023 | Environmental approval granted | 189.5 acres | ₹341.7 crore |
In context
57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 189.5 acres, this one is larger than 86% of them.
Where it is
Kapand, Lahunipara, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project For Installation Of Iron Ore Beneficiation Plant- 1.5 MTPA… — environmental approval granted, 0 m away
- Iron Ore Beneficiation Plant of Capacity 12,00,000 TPA (Throughput) at San… — under environmental review, 6.6 km away
- 1.0 MTPA (throughput) Iron Ore Beneficiation Plant, alongside the existing 60… — cleared for impact study, 6.6 km away
- For obtaining Stage-I clearance for capacity enhancement of Sponge Iron Plant… — more information requested, 6.6 km away
- Expansion of existing 66,000 TPA Sponge Iron unit to proposed final capacity… — lapsed, 6.6 km away
- Reconsideration of the EC Application for Deogaon-II Sand Quarry over an Area… — not approved, 7.2 km away
- Grant of EC of DEOGAON-II SAND BED over an area 12.35Ac or 5.00Hc — not approved, 7.2 km away
- Optimization and modification in EC configuration from 3x12 T IF to 2x20T IF;… — initial checks, 7.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.