What is Developing? Open the mapMap

Environmental approval grantedMining · Kendujhar, Odisha

Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA (Throughput) Capacity to 16.0 MTPA (Throughput), Relocation of Tailing Dam

Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA (Throughput) Capacity to 16.0 MTPA (Throughput), Relocation of Tailing Dam is an approved mining project in Dabuna, Bamebari, Kendujhar, Odisha. The site covers 89.8 acres. Its stated project cost is ₹3,340.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Aug 2024).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA (Throughput) Capacity to 16.0 MTPA (Throughput), Relocation of Tailing Dam is an approved mining project in Dabuna, Bamebari, Kendujhar, Odisha. The site covers 89.8 acres.

Who is building it?

The applicant is M/S Arcelormittal Nippon Steel India Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Aug 2024), as of 27 Nov 2026.

Where is it?

In Dabuna, Bamebari, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹3,340.2 crore and a site of 89.8 acres.

When was it filed?

The application was filed on 28 Dec 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA…

Project details

Official titleProposal for amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA (Throughput) Capacity to 16.0 MTPA (Throughput), Relocation of Tailing Dam at Village - Sankari, Gram Panchayat - Phuljhar, Dist. - Keonjhar, Laying of Tailing Pipeline and Return Water Pipeline from Beneficiation Plant to Tailing Dam and Laying of Water Pipeline and Slurry Pipeline from Beneficiation Plant to Ghoraburhani - Sagasahi Iron Ore Block.
StatusEnvironmental approval granted
Status since13 Aug 2024
Application filed28 Dec 2023
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantM/S Arcelormittal Nippon Steel India Limited
Land area89.8 acres (36.3 ha)
Project cost₹3,340.2 crore
Village / localityDabuna
Taluk / tehsilBamebari
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00389

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 28 Sept 2026Environmental approval granted89.8 acres₹3,340.2 crore
Amendment filed 16 Aug 2025Environmental approval granted89.8 acres₹3,340.2 crore
Amendment filed 28 Dec 2023 (this page)Environmental approval granted89.8 acres₹3,340.2 crore

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 89.8 acres, this one is larger than 58% of them.

No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.

Where it is

Dabuna, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

5 Arcelormittal Nippon Steel projects in Kendujhar
All 65 Arcelormittal Nippon Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.