Quick answers
What is this project?
Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA (Throughput) Capacity to 16.0 MTPA (Throughput), Relocation of Tailing Dam is an approved mining project in Dabuna, Bamebari, Kendujhar, Odisha. The site covers 89.8 acres.
Who is building it?
The applicant is M/S Arcelormittal Nippon Steel India Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Aug 2024), as of 27 Nov 2026.
Where is it?
In Dabuna, Bamebari, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹3,340.2 crore and a site of 89.8 acres.
When was it filed?
The application was filed on 28 Dec 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA…
Project details
| Official title | Proposal for amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA (Throughput) Capacity to 16.0 MTPA (Throughput), Relocation of Tailing Dam at Village - Sankari, Gram Panchayat - Phuljhar, Dist. - Keonjhar, Laying of Tailing Pipeline and Return Water Pipeline from Beneficiation Plant to Tailing Dam and Laying of Water Pipeline and Slurry Pipeline from Beneficiation Plant to Ghoraburhani - Sagasahi Iron Ore Block. |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Aug 2024 |
| Application filed | 28 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | M/S Arcelormittal Nippon Steel India Limited |
| Land area | 89.8 acres (36.3 ha) |
| Project cost | ₹3,340.2 crore |
| Village / locality | Dabuna |
| Taluk / tehsil | Bamebari |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00389 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 28 Sept 2026 | Environmental approval granted | 89.8 acres | ₹3,340.2 crore |
| Amendment filed 16 Aug 2025 | Environmental approval granted | 89.8 acres | ₹3,340.2 crore |
| Amendment filed 28 Dec 2023 (this page) | Environmental approval granted | 89.8 acres | ₹3,340.2 crore |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 89.8 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Dabuna, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA… — environmental approval granted, 0 m away
- Change of Company Name in Environmental Clearances (ECs) from M/s.… — environmental approval granted, 0 m away
- Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA… — environmental approval granted, 0 m away
- Manganese Beneficiation Unit of throughput capacity 19,000 TPA over an area of… — under environmental review, 1.1 km away
- Katupali Iron Ore Block — lapsed, 1.3 km away
- Diversion of Forest Land Over 4.381 Ha From Kolmong to Palaspanga of Jsw Utkal… — lapsed, 1.3 km away
- DIVERSION OF 0.399 Ha. SABIK FOREST LAND IN KEONJHAR FOREST DIVISION COMING… — lapsed, 1.7 km away
- Naibuga & Katupali Iron & Manganese Mines — initial checks, 1.7 km away
5 Arcelormittal Nippon Steel projects in Kendujhar
All 65 Arcelormittal Nippon Steel projects across India