Quick answers
What is this project?
Diversion of Forest Land Over 4.381 Ha From Kolmong to Palaspanga of Jsw Utkal Steel LTD is a lapsed pipeline project in God>Topa, Bamebari, Kendujhar, Odisha. The site covers 410.1 acres.
Who is building it?
The applicant is Jsw Utkal Steel Limited.
Has it been approved?
No. The application was lapsed on 19 Feb 2024, so it is no longer under consideration.
Where is it?
In God>Topa, Bamebari, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹2.6 crore; a site of 410.1 acres and 10.8 acres (4.4 ha) of forest land.
When was it filed?
The application was filed on 28 Nov 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Feb 2024 |
| Application filed | 28 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Jsw Utkal Steel Limited |
| Land area | 410.1 acres (166 ha) |
| Forest land | 10.8 acres (4.4 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | God>Topa |
| Taluk / tehsil | Bamebari |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04272 |
In context
11 applications in Kendujhar since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. At 410.1 acres, this one is larger than 91% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
God>Topa, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Katupali Iron Ore Block — lapsed, 1.3 km away
- Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA… — environmental approval granted, 1.3 km away
- Change of Company Name in Environmental Clearances (ECs) from M/s.… — environmental approval granted, 1.3 km away
- Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA… — environmental approval granted, 1.3 km away
- Amendment of EC for Expansion of Iron Ore Beneficiation Plant from 10.7 MTPA… — environmental approval granted, 1.3 km away
- Nayagarh Iron Ore Mines of Kc Pradhan — lapsed, 1.5 km away
- Nayagarh Iron Ore Mines of Kc Pradhan — lapsed, 1.5 km away
- Nayagarh Iron Ore Mines — forest land use approved, 1.6 km away
More from Jsw Utkal Steel Limited in Kendujhar
- Diversion of Forest Land for Proposed Slurry Pipeline Crossing Within the… — lapsed
- ReDiversion of forest land over 0.738 ha ( 0.225 ha in Keonjhar Division &… — lapsed
3 Jsw Utkal Steel projects in Kendujhar
All 10 Jsw Utkal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.