What is Developing? Open the mapMap

WithdrawnPower · Dhenkanal, Odisha

Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant (Phase-ll)

Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant (Phase-ll) is a withdrawn power project in Senapatiberana, Motunga, Dhenkanal, Odisha. The site covers 1,158.4 acres. Its stated project cost is ₹7,493 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 5 Sept 2024).

See it on the live map All projects in Dhenkanal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion by addition of 1x350 MW Imported Coal based Thermal Power Plant (Phase-ll) at village Kamalanga, in Odapada Taluk, Dhenkanal District, Odisha
StatusWithdrawn
Status since5 Sept 2024
Application filed13 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantGmr Kamalanga Energy Limited
Land area1,158.4 acres (468.8 ha)
Project cost₹7,493 crore
Village / localitySenapatiberana
Taluk / tehsilMotunga
DistrictDhenkanal
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00401

In context

8 applications in Dhenkanal since January 2022 are in the same category (Power): 3 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Senapatiberana, Motunga, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gmr Kamalanga Energy Limited in Dhenkanal

All 6 Gmr Kamalanga Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.