One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant (Phase-ll)
Project details
| Official title | Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant (Phase-ll) at village Kamalanga, in Odapada Taluk, Dhenkanal District, Odisha |
|---|---|
| Status | Cleared for impact study |
| Status since | 6 Jan 2024 |
| Application filed | 19 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Gmr Kamalanga Energy Limited |
| Land area | 1,158.4 acres (468.8 ha) |
| Project cost | ₹7,493 crore |
| Village / locality | Bhagabatpur |
| Taluk / tehsil | Motunga |
| District | Dhenkanal |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00563 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 21 Oct 2026 | Under environmental review | 1,158.4 acres | ₹1,600 crore |
| Expansion filed 16 May 2025 | Environmental approval granted | 1,158.4 acres | ₹7,493 crore |
| Early planning filed 19 Oct 2023 (this page) | Cleared for impact study | 1,158.4 acres | ₹7,493 crore |
In context
8 applications in Dhenkanal since January 2022 are in the same category (Power): 3 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhagabatpur, Motunga, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant… — under environmental review, 0 m away
- Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant… — environmental approval granted, 0 m away
- Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant… — environmental approval granted, 0 m away
- Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant… — withdrawn, 250 m away
- Re-Diversion of 9.628 Ha Forest Land in Dhenkanal Forest Division, Dhenkanal,… — not approved, 1.7 km away
- Mangalpur Sand Quarry over an area of 11.80 Acre or 4.77 Ha under Odapada… — environmental approval granted, 2.7 km away
- Submission of Replenishment Study Report of Environmental Clearance for… — not approved, 2.9 km away
- Damol Sand Quarry — environmental approval granted, 2.9 km away
More from Gmr Kamalanga Energy Limited in Dhenkanal
- Re-Diversion of 9.628 Ha Forest Land in Dhenkanal Forest Division, Dhenkanal,… — not approved
- Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant… — environmental approval granted
- Expansion by addition of 1x350 MW Imported Coal based Thermal Power Plant… — withdrawn
All 6 Gmr Kamalanga Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.