Quick answers
What is this project?
Proposed an Integrated Steel Plant of 1.0 Million Ton Per Annum is a proposed industrial project in Anandpur, Rairangpur Town, Mayurbhanj, Odisha. The site covers 2,807.7 acres.
Who is building it?
The applicant is Rungta Metals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 May 2023), as of 27 Nov 2026.
Where is it?
In Anandpur, Rairangpur Town, Mayurbhanj, Odisha.
How big is it?
It has a stated cost of ₹5,585 crore and a site of 2,807.7 acres.
When was it filed?
The application was filed on 16 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed an Integrated Steel Plant of 1.0 Million Ton Per Annum
Project details
| Official title | Proposed an Integrated Steel Plant of 1.0 Million Ton Per Annum along with 190.0 MW Captive Power Plant for M/s Rungta Metals Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 May 2023 |
| Application filed | 16 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rungta Metals Private Limited |
| Land area | 2,807.7 acres (1,136.2 ha) |
| Project cost | ₹5,585 crore |
| Village / locality | Anandpur |
| Taluk / tehsil | Rairangpur Town |
| District | Mayurbhanj |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00467 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 16 May 2023 (this page) | Cleared for impact study | 2,807.7 acres | ₹5,585 crore |
| New project filed 15 May 2023 | Lapsed | 2,807.7 acres | ₹5,585 crore |
Where it is
Anandpur, Rairangpur Town, Mayurbhanj, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed an Integrated Steel Plant of 1.0 Million Ton Per Annum — lapsed, 0 m away
- Kathabharia Sand Bed Over an area of 12.04 Acres or 4.872 Hectares — not approved, 11.9 km away
- Extension of Validity Period of EC for Baghia Stone Quarry Over an area of… — not approved, 16.4 km away
- Baghia Stone Quarry Over an area of 4.92 Acre or 1.99 Hectares — environmental approval granted, 16.4 km away
- Balanposi Stone Quarry Over an Area of 2.00 Acres Or 0.809 Hectares — environmental approval granted, 18.9 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted, 19.6 km away
- Dalki - 1 Quartz & Quartzite Mines over 3.845 ha — lapsed, 19.7 km away
- Dalki Quartz & Quartzite Mine over 1.295 ha — environmental approval granted, 20.2 km away
All 4 Rungta Metals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.